News

On 27 August, opening ceremony of secondary school No. 13 after major repairs was held in Velikiye Luki
On 26 August 2016, Transneft Upper Volga carried out a regular (for the fourth time in a season) effort of aquatic bioresources reproduction.
Transneft Upper Volga has allocated 2 RUB million for repair of a school gym and sports grounds as part of the special-purpose charitable donation contract, signed with MBEI Konstantinovskaya SGES
Transneft Upper Volga has finished reconstruction of Solnechnogorskaya and Nagornaya loading stations (LS) of the ring petroleum products pipeline around Moscow and has started commissioning operations.
Diesel fuel seepage occurred on July 30 at the distance of about 500 metres from the petroleum products trunk pipeline near village Lagovskaya (near Klimovsk) from the illegal tapping.
Transneft Upper Volga finishes reconstruction of sections of Surgut – Polotsk oil trunk pipeline (OTP), performed in the territory of Dalne-Konstantinovsky and Bogorodsky Districts of Nizhny Novgorod Region.
Transneft Upper Volga started construction of non-public railway tracks for the transport of jet fuel from the future pipe-end pump station (PEPS) Shilovo-3 to the Shelukhovo railroad station in Ryazan Region.
Transneft Upper Volga is replacing electric drives on the valves of operating pump stations (PS) with up-to-date equipment – EPTs-type electric drives that are manufactured by Tomsk Plant of Electric Drives (TOMZEL, subsidiary of Transneft Central Siberia)
Transneft Upper Volga conducted regular artificial reproduction of water biological resources on July 8, 2016.